Preparation of corrosion-protective copper paste through single process and application thereof to dipole tag antenna

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9945038
SERIAL NO

14909919

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a method of producing corrosion-protective copper paste through a single process and an application thereof to a dipole tag antenna. Copper powder is surface-etched by using a hydrochloric acid in an inert gas atmosphere, a phosphoric acid aqueous solution is added thereto to form copper phosphate on the etched surface of the copper powder, and then, a vinyl imidazole-silane copolymer and poly(4-styrenesulfonate) were introduced thereto to form a corrosion-protective coating layer on the surface of copper powder on which the copper phosphate has been formed, and a centrifuge and an agate mortar are used to prepare a copper paste having high viscosity and high dispersability. When a copper paste thin film is formed on a flexible film by screen printing, a produced dipole tag antenna may have high efficiency.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEOUL NATIONAL UNIVERSITY R&DB FOUNDATION1 GWANAK-RO GWANAK-GU SEOUL 08826

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jang, Jyongsik Seoul, KR 5 48
Shin, Keunyoung Seoul, KR 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00