Multi-air chamber burner with swirl generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9945555
SERIAL NO

14733293

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A burner is disclosed for generating flame and heat. The burner includes a first stage, a second stage downstream of the first stage, a third stage downstream of the first and second stages, and a fourth stage downstream of the first, second, and third stages. The first stage comprises a first innermost air chamber and a first mixing chamber for air and fuel, wherein the first stage includes separate conduits for air and fuel, and wherein the air and fuel begin to mix in the first mixing chamber during use to form an air/fuel mixture. The second stage comprises a second mixing chamber which comprises a deflection plate to force the air/fuel mixture outward from the centerline. The third stage comprises a combustion zone. The combustion zone includes a swirl generator. The swirl generator has an inner diameter greater than an outer diameter of the deflection plate. The swirl generator produces a swirl, whirl, vortex, or the like in the flame during operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CRUZ PEDRO HERNANDEZNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cruz, Pedro Hernandez Irapuato, MX 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00