Multi-tank material balance model

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9945703
SERIAL NO

14604367

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments are directed to performing material balance analysis for tanks in a petroleum reservoir and to performing dual porosity material balance analysis. In one scenario, a computer system divides a reservoir into multiple tank blocks, where at least two tank blocks are adjacent. The adjacent tanks are connected at a tank block boundary so that materials are permitted to travel between the tank blocks. The computer system determines flow rate between adjacent tank blocks proportional to the difference in tank block pressures. Then, upon making this determination, the computer system determines material balance for at least some of the tank blocks in the reservoir through influx and efflux of material across the tank block boundary. The material balance includes a determined material balance for one of the adjacent tank blocks and a determined material balance for the other adjacent tank block.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QRI GROUP LLC2 HOUSTON CENTER 909 FANNIN SUITE 2200 HOUSTON TX 77010

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Areas, David Castiñeira Houston, US 2 13
Matringe, Sébastien François Houston, US 3 24
Salehi, Amir Stanford, US 30 290

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00