High temperature electrostatic chuck with real-time heat zone regulating capability

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9948214
SERIAL NO

13793512

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of the present invention provide electrostatic chucks for operating at elevated temperatures. One embodiment of the present invention provides a dielectric chuck body for an electrostatic chuck. The dielectric chuck body includes a substrate supporting plate having a top surface for receiving a substrate and a back surface opposing the top surface, an electrode embedded in the substrate supporting plate, and a shaft having a first end attached to the back surface of the substrate supporting plate and a second end opposing the first end. The second end is configured to contact a cooling base and provide temperature control to the substrate supporting plate. The shaft is hollow having a sidewall enclosing a central opening, and two or more channels formed through the sidewall and extending from the first end to the second end.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • APPLIED MATERIALS INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Xing West Babylon, US 65 2748
Lubomirsky, Dmitry Cupertino, US 294 27269
Makhratchev, Konstantin Fremont, US 29 1326
Sun, Jennifer Y Mountain View, US 254 11422
Thach, Sehn Union City, US 3 20
Willwerth, Michael D Campbell, US 65 2746

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00