Manufacturing method of sintered alloy, compact for sintering, and sintered alloy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9950369
SERIAL NO

15421787

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Mixed powder that contains first hard particles, second hard particles, graphite particles, and iron particles is used to manufacture a sintered alloy. The first hard particle is a Fe—Mo—Cr—Mn based alloy particle, the second hard particle is a Fe—Mo—Si based alloy particle. The mixed powder contains 5 to 50 mass % of the first hard particles, 1 to 8 mass % of the second hard particles, and 0.5 to 1.0 mass % of the graphite particles when total mass of the first hard particles, the second hard particles, the graphite particles, and the iron particles is set as 100 mass %.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHATOYOTA-SHI AICHI-KEN 471-8571
SANYO SPECIAL STEEL CO LTDHIMEJI-SHI HYOGO 672-8677
FINE SINTER CO LTD1189-11 NISHINOHORA AKECHI-CHO KASUGAI-SHI AICHI 480-0303

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ando, Kimihiko Toyota, JP 26 155
Fukumoto, Shingo Himeji, JP 11 35
Sawada, Toshiyuki Himeji, JP 44 93
Shinohara, Nobuyuki Tajimi, JP 21 32
Sugimoto, Masaru Tajimi, JP 50 2183
Ueda, Yoshihisa Nagoakakyo, JP 24 251
Yoshida, Yusaku Tajimi, JP 44 68

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00