Power generation device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9950609
SERIAL NO

15318332

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power generation device capable of achieving reduction in size and compactification, and increasing a change gear ratio is provided. In a power generation device 20 of a vehicle including a front wheel as a drive wheel and a rear wheel 13 as a driven wheel, a gear mechanism 30A as an input side gear mechanism in which a ring-shaped internal gear 37 is disposed coaxially with a sun gear 38 and a plurality of intermediate gears 36 are interposed in a ring-shaped space between the internal gear 37 and the sun gear 38 is fixed to the vehicle via a cylinder member 22 as a support shaft having an axis matched with an axis of a cup-shaped joint 51 as a rotation shaft of the rear wheel 13, the internal gear 37 of the gear mechanism 30A is formed to be integrally rotatable with the rear wheel 13, an output shaft 52 penetrating through the cylinder member 22 is fixed to the sun gear 38, and a power generator 53 is provided at the output shaft 52.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JHL CO LTD944-1 OAZA SAIDO MOROYAMA-MACHI IRUMA-GUN SAITAMA 350-0438

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Takehana, Kiichi Saitama, JP 3 6
Takehana, Koji Saitama, JP 2 3
Takehana, Toshiichi Saitama, JP 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00