Vehicle power source system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9950630
SERIAL NO

14758283

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

While a current cutoff mechanism cuts off charging and discharging currents for a second electric storage device, a DC/DC converter is controlled so as to be in a state where electric power is supplied from a low-voltage side to a high-voltage side, applies voltage conversion to an input voltage of the low-voltage side so that an output voltage of the high-voltage side becomes a predetermined voltage, and after a predetermined state where the induction voltage of the AC power generator can be supplied to the low-voltage side is reached, control of the DC/DC converter is switched from the state where electric power is supplied from the low-voltage side to the high-voltage side to a state where electric power is supplied from the high-voltage side to the low-voltage side.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Date, Toshiaki Tokyo, JP 21 158
Kamioka, Nozomu Tokyo, JP 27 92
Murata, Yasukazu Hyogo, JP 15 77
Wachi, Satoshi Tokyo, JP 45 292
Yamaguchi, Shingo Tokyo, JP 88 1150

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00