Ball-bearing control cable, a mechanical system, and an aircraft

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9950783
SERIAL NO

15257172

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A ball-bearing control cable comprising an outer sheath surrounding a central blade. The outer sheath comprises a central portion extending between two endpieces. Each endpiece comprises a tubular central body that surrounds the central blade, each central body extending from a proximal abutment secured to the central portion towards a free distal abutment, each abutment of an endpiece projecting from the central body of the endpiece, each endpiece including a resilient system interposed around the central body of the endpiece between an abutment of the endpiece and a ring, the resilient system of one endpiece being arranged between the distal abutment and the ring of the endpiece, and the resilient system of the other endpiece being arranged between the proximal abutment and the ring of the other endpiece.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIRBUS HELICOPTERSAÉROPORT INTERNATIONAL MARSEILLE-PROVENCE MARIGNANE CEDEX 13725

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bihel, Jean-Romain Le Rove, FR 15 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00