Manufacturing of nitrogen-containing materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9950966
SERIAL NO

14412662

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

It has been discovered that waste cross-linked polymer materials both synthetic (scrap tire rubber, used polyurethane, and epoxy and phenol resins in discarded printed circuit boards) and natural (wood biomass, keratin, and chitin) can be conveniently depolymerized at slightly elevated temperatures and moderate pressures by the action of a liquid chemical reagent. The proposed inexpensive process results in a substantial to total depolymerization of synthetic polymers and thereby recovers valuable liquid and solid materials. When applied to lignocellulosic biomass, the proposed process, depending on the reaction conditions, either unlocks the lignin-hemicellulose matrix making cellulose more available for fermenting microorganisms or results in carbonization, or coalification of the biomass that may be desirable in terms of sequestering excessive carbon from the Earth's biosphere.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GESTALT CHEMICAL PRODUCTS INCALACHUA FL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Oliferenko, Alexander Gainesville, US 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00