Twin-shaft gas turbine for multiple frequency power generation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9951696
SERIAL NO

13675481

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A twin-shaft gas turbine can be used for 50 and 60 Hz power generation without using a reducer. A gas generator includes a compressor that generates compressed air, a burner that burns a fuel mixed with the compressed air received from the compressor so as to generate combustion gas, and a high-pressure turbine that is rotationally driven by the combustion gas received from the burner and generates driving force for the compressor. An output turbine includes a low-pressure turbine that is driven by exhaust gas received from the high-pressure turbine and a power generator that is driven by the low-pressure turbine. A control device reduces opening degree of IGV of the compressor and thereby reduces power of the compressor, and the rotational frequency of the gas generator is increased in a full-speed no-load operating state of the power generator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTD3-1 MINATOMIRAI 3-CHOME NISHI-KU YOKOHAMA 220-8401

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kuroki, Hidetoshi Hitachi, JP 20 223
Murata, Hidetaro Hitachi, JP 26 406
Nanataki, Kenji Hitachinaka, JP 16 107

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00