Pipeline system for a solar power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9951756
SERIAL NO

15113125

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a pipeline system for a linearly concentrating solar power plant (1) with at least one receiver line (13), in which a heat transfer medium is heated by radiating solar energy, or with a central receiver and at least one emptying tank (21) and/or one store for the heat transfer medium, the heat transfer medium having a vapor pressure of less than 0.5 bar at the maximum operating temperature. Furthermore, a gas displacement system (31) is comprised, which connects gas spaces in the at least one emptying tank (21) and/or in the store for the heat transfer medium to one another and which has a central gas store (35) and/or a central gas connection (37) and a central exhaust gas outlet (39), through which gas can be discharged into the surroundings.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BASF SE67056 LUDWIGSHAFEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Federsel, Katharina Heidelberg, DE 11 64
Ladenberger, Michael Annweiler am Trifels, DE 13 61
Lutz, Michael Speyer, DE 44 673
Maurer, Stephan Neustadt, DE 36 233
Schierle-Arndt, Kerstin Zwingenberg, DE 49 390
Wortmann, Jürgen Limburgerhof, DE 18 98

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00