Heat exchanger with integrated co-axial inlet/outlet tube

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9951998
SERIAL NO

14392387

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-pass heat exchanger is provided wherein the heat exchanger is comprised of a plurality of stacked heat exchange plates defining a plurality of alternating first and second fluid channels interconnecting respective pairs of manifolds. At least one of the manifolds in the pairs of manifolds is in the form of an annular manifold structure which divides the heat exchanger into at least a first part and a second part thereby forming at least a two-pass flow path. The annular manifold structure is provided by a generally tubular manifold insert having one end embedded within the manifold. A first annular manifold flow passage communicates with one of the sets of fluid channels in the first part of the heat exchanger and a second, central manifold flow passage communicates with the corresponding set of fluid channels in the second part of the heat exchanger.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DANA CANADA CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bardeleben, Michael Oakville, CA 16 193
Bhatia, Sachin Mississauga, CA 17 145

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00