Management system for illumination facility

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9952091
SERIAL NO

15207946

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides a management system for an illumination facility, which comprises an illuminance measuring instrument, a position detector for detecting a position of the traveling vehicle, and an arithmetic device, which are mounted on a traveling vehicle, wherein the arithmetic device is configured to save a map information, positional data of an illumination lamp, initial data including illuminance data, and the illuminance data as acquired by the illuminance measuring instrument while driving the traveling vehicle, and wherein the arithmetic device is configured to calculate daily management data of the illumination facility based on the positional data of the traveling vehicle as detected by the position detector, the map information, and the illuminance data, and further wherein the arithmetic device is configured to calculate a change of the illumination facility including the illumination lamp based on the initial data and the daily management data.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOPCON CORPORATION75-1 HASUNUMA-CHO ITABASHI-KU TOKYO 1748580

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Isozaki, Hisashi Tokyo-to, JP 31 261

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00