Power-supply control device and programmable logic controller

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9952286
SERIAL NO

14784074

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power-supply control device includes a power-source input terminal, an output circuit outputting power to load, power interrupting circuits connected in parallel between the power-source input terminal and the output circuit, and a control circuit controlling each power interrupting circuit separately. Each power interrupting circuit includes an interrupting circuit and a switch element connected in series between the power-source input terminal and the output circuit. The interrupting circuit permits power to pass when receiving a passage permitting signal from the control circuit and interrupts passage of power when not receiving the passage permitting signal. ON/OFF of the switch element is controlled by the control circuit. When any of the power interrupting circuits is set as a diagnostic target circuit, the control circuit stops supplying the passage permitting signal to the interrupting circuit of the diagnostic target circuit and turns off the switch element of the diagnostic target circuit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008310 ?1008310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kato, Akihisa Tokyo, JP 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00