Laminated ceramic electronic component mounting structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9953765
APP PUB NO 20150325367A1
SERIAL NO

14702881

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A laminated ceramic electronic component mounting structure includes a laminated ceramic electronic component including a ceramic body, first and second inner electrodes in the ceramic body including opposed portions including at least portions of which are opposed to each other in a thickness direction of the ceramic body, a first terminal electrode electrically connected to the first inner electrode, and a second terminal electrode electrically connected to the second inner electrode; and a circuit board including first and second electrode lands electrically connected to the first and second terminal electrodes and on which the laminated ceramic electronic component is mounted, wherein widths of the first and second electrode lands are smaller than widths of the first and second inner electrodes at the opposed portions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MURATA MANUFACTURING CO LTDKYOTO-FU 617-8555

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nishimura, Masashi Nagaokakyo, JP 16 88
Takeuchi, Shunsuke Nagaokakyo, JP 60 547

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00