Manufacturing method of PTC element using polymer aqueous emulsion conductive composite, PTC element manufactured by manufacturing method, and planar heating element including PTC element

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9955531
SERIAL NO

14603649

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacturing method of a PTC (Positive Temperature Coefficient) element includes: producing a polymer aqueous emulsion solution; producing a polymer aqueous emulsion conductive composite by mixing the polymer aqueous emulsion solution with a conductive agent; and producing the PTC element by coating a substrate with the polymer aqueous emulsion conductive composite, or print the polymer aqueous emulsion conductive composite on the substrate, or dipping the substrate in the polymer aqueous emulsion conductive composite and drying the substrate. Here, the polymer aqueous emulsion solution includes an adhesive polymer, a cross-linking agent, an initiator, and water. The substrate is film, non-woven, textile, inflexible plate, and the like, which are formed of polymer resin.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KANG SUK HWAN207-DONG 1602-HO 13 BAEUL 1-RO YUSEONG-GU DAEJEON 305-742

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kang, Suk Hwan Daejeon, KR 2 12
Nah, Jong Bok Daejeon, KR 1 12
Won, Jeong Ha Daejeon, KR 1 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00