Method for separating a feed material containing immiscible phases of different densities

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9956503
SERIAL NO

15701213

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solvent diluted bitumen is produced by a method that includes adding paraffinic solvent to bitumen froth to form a solvent diluted bitumen froth, and discharging the solvent diluted bitumen froth into a vessel, such that settlement of the solvent diluted bitumen froth in the interior of the vessel establishes a heavier phase zone, a lighter phase zone, and an interface. A discharge point is located above the interface and within the lighter phase zone. Lighter phases separate up toward an overflow outlet of the vessel while heavier phases separate down toward an underflow outlet of the vessel. The solvent diluted bitumen is collected from the overflow outlet, and a solvent diluted underflow stream is collected from the underflow outlet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORT HILLS ENERGY L PC/O PETRO-CANADA INC P O BOX 2844 150-6TH AVENUE SW CALGARY ALBERTA T2P 3E3

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Diep, John Khai-Quang Burnaby, CA 8 59
Foulds, Gary Calgary, CA 3 1
Shariati, Mohammed Reza Coquitlam, CA 2 1
Van, Der Merwe Shawn Calgary, CA 24 119

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00