Fibre composite component, winglet and aircraft with a fibre composite component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9957032
SERIAL NO

14054875

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fiber composite component made of a fiber composite material comprises at least one first surface section, at least one second surface section and at least one transition region. The first surface section and the second surface section are arranged at an angle to each other and incorporate the transition region. The transition region comprises at least one first curvature section and at least one second curvature section whose mean curvatures differ from each other, which curvature sections connect to each other in a tangentially continuous manner. The first surface section connects to the transition region, and the transition region connects to the second surface section in each case in a tangentially continuous manner. In one example, the radius of curvature of the first curvature section is smaller than that of the second curvature section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIRBUS OPERATIONS GMBHKREETSLAG 10 HAMBURG 21129

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kremer, Tobias Bremen, DE 1 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00