Structure for aircraft, method of manufacturing structure for aircraft and method of making design information of structure for aircraft

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9957063
SERIAL NO

15048671

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one implementation, a structure for an aircraft includes a first structural member, a second structural member coupled to the first structural member, a fastener and a conductive object. The fastener couples the first structural member to the second structural member. The fastener is inserted into an insertion hole formed in a portion where the first structural member is overlapped with the second structural member. The fastener is in electrically non-contact with the first and second structural members in the insertion hole. The conductive object is embedded inside at least either one of the first and second structural members. The conductive object prevents a spark between the fastener and each of the first and second structural members by forming a current pathway that leads current, flowing inside the at least either one of the first and second structural members, to the other structural member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUBARU CORPORATION1-20-8 EBISU SHIBUYA-KU TOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akiba, Kousaburou Tokyo, JP 8 11
Fujita, Hiroyasu Tokyo, JP 14 268
Hiromatsu, Yoshiaki Tokyo, JP 1 4
Kawashima, Ai Tokyo, JP 4 7
Komaba, Yasueki Tokyo, JP 1 4
Nishi, Takayuki Tokyo, JP 46 159

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00