Flow passage partition structure and fluid control valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9958076
SERIAL NO

15165360

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A flow passage partition structure including a flow passage member including a flow passage space portion, a partition member partitioning the flow passage space portion into a first flow passage and a second flow passage, the partition member including a first plate and a second plate being in contact with the first plate in a state where the second plate is press-fitted in an inner circumferential surface of the flow passage space portion, the first plate including an outer circumferential surface that is out of contact with the inner circumferential surface of the flow passage space portion, and the first plate, the second plate, and the inner circumferential surface of the flow passage space portion forming a space portion that corresponds to a foreign material storage portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AISIN SEIKI KABUSHIKI KAISHA1 ASAHI-MACHI 2-CHOME KARIYA-SHI AICHI-KEN 448-8650

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kobayashi, Masaki Okazaki, JP 317 2802
Shigyo, Hiromitsu Toyota, JP 9 19
Yamakawa, Yoshiaki Toyota, JP 14 37

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00