Permanent magnet-type molten metal stirring device and melting furnace and continuous casting apparatus including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9958209
SERIAL NO

15113621

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A permanent magnet-type molten metal stirring device includes: a support body that can suppress heat transfer from molten metal; a magnetic field unit provided above the support body and including a permanent magnet allowing magnetic force lines to vertically extend in the molten metal; and a drive unit provided below the support body and driving the molten metal with an electromagnetic force generated by the magnetic force lines and current allowed to flow through the molten metal by the drive unit. The drive unit includes: a cylindrical drive main body mounted on a lower portion of the support body and including a passage formed therein and laterally extending in a longitudinal direction, and a pair of electrodes provided at positions opposed to each other along a width direction via the passage, the pair of electrodes allowing current intersecting the magnetic lines of force in the molten metal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAKAHASHI KENZOSHIROI-SHI CHIBA 270-1426

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Takahashi, Kenzo Matsudo, JP 60 394

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00