Method for manufacturing a transparent conductive electrode using carbon nanotube films

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9960293
SERIAL NO

12306849

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for preparing a transparent electrode using a carbon nanotube (CNT) film, and more particularly, to a method for preparing a transparent electrode, the method comprising the steps of forming a CNT film on a desired substrate using a dispersed solution of CNT and then reducing/forming metal nanoparticles on the surface of the CNT film. According to the present invention, a transparent electrode in which gold nanoparticles are formed on the surface of high density CNT film having high purity, can be prepared. The inventive transparent electrode has high visible ray penetration and an excellent electrical conductivity by hyperfine metal particles uniformly formed on the surface thereof as well as a uniform increase in electrical conductivity over the whole CNT film, and thus it can be applied to various displays as well as image sensors, solar cells, touch panels, digital papers, electromagnetic shielding agents, static charge preventing agents and the like.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA ADVANCED INSTITUTE OF SCIENCE AND TECHNOLOGYGUSEONG-DONG 291 DAEHAK-RO YUSEONG-GU DAEJEON 34141

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jung, Hee-Tae Daejeon, KR 19 47
Kong, Byung-Seon Daejeon, KR 1 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00