Control circuit and switching power supply

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9960673
SERIAL NO

15042965

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control circuit according to an embodiment of the present invention is configured to control a switching element of a switching power supply. The control circuit includes a comparator having a first input terminal configured to receive an output voltage of the switching power supply. The comparator has a second input terminal that is connectable to a positive terminal of a reference voltage source. The comparator has an output. The output brings the reference voltage to a first voltage while the output signal takes a first voltage level. The output brings the reference voltage to a second voltage while the output signal takes a second voltage level. The constant voltage source has a positive terminal connected to a negative terminal of the reference voltage source and a ground of the comparator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TDK CORPORATION2-5-1 NIHONBASHI CHUO-KU TOKYO 103-6128

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Min Tokyo, JP 83 503
Matsuura, Ken Tokyo, JP 31 291

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00