Device and method for acquiring electricity utilization information

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9961417
SERIAL NO

15115107

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a device for acquiring electricity utilization information which comprises a data acquisition and processing circuit configured to detect an operation parameter about a coupleable power supply circuit; a non-isolated power supply configured to convert an AC power into a DC power to supply an appropriate operation voltage to the data acquisition and processing circuit; a data communication module configured to modulate the detected operation parameter onto a predetermined frequency, wherein the modulated operation parameter is transmitted with a predetermined data transmission rate, and the predetermined frequency is higher than the predetermined data transmission rate such that the transmitted operation parameter can be demodulated; and an isolation component configured to provide electrical isolation and signal transmission isolation to perform a coupling isolation for the modulated operation parameter. The device not only can achieve divided measurement of electricity utilization, but also has the advantage of smaller volume.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LIU BING100029 ANZHEN HOSPITAL CARDIOLOGY PACING CENTER CHAOYANG DISTRICT BEIJING BEIJING CITY BEIJING CITY 100029

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Bing Beijing, CN 414 3981

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00