Method of producing workpiece and workpiece thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9962765
SERIAL NO

13661191

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing a workpiece includes: providing a first powder, with a hardness of the first powder being less than 250 HV, and with a mean particle size of the first powder being less than 20 μm; mixing the first powder and a second powder to form a mixed powder, with the mixed powder including carbon, chromium, iron, and elements selected from the group consisting of molybdenum, nickel, copper, niobium, vanadium, tungsten, silicon, cobalt, and manganese; adding a binder and water to the mixed powder; applying a spray drying process to granulate the mixed powder to form a spray-dried powder; applying a dry pressing process to the spray-dried powder to form a green part; applying a debinding process to the green part to form a debound body; and sintering the debound body into a workpiece having a hardness of higher than 250 HV.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA POWDER TECHNOLOGIES CO LTDNO 368 SHENGXIN ROAD WUJIANG DISTRICT SUZHOU CITY JIANGSU PROVINCE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheong, Chi Kin Macau, CN 1 0
Hwang, Kuen-Shyang Taipei, TW 18 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00