Controller circuit for air conditioner with cool air guided with room temperature airstream

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9964324
SERIAL NO

13872816

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A first fan controlling section of a controller circuit is configured to control a first blower fan so as to induce the discharge of the airflow of a cool air through a first air outlet defined in a first enclosure of an indoor unit of the air conditioner. A second fan controlling section is configured to control second blower fans so as to induce the discharge of the airflows of a room air through second air outlets, respectively, defined in a pair of second enclosures disposed on the opposite sides of the first enclosure. An enclosure attitude controlling section is configured to change the respective attitude of the second enclosures relative to the first enclosure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJITSU GENERAL LIMITEDKAWASAKI-SHI KANAGAWA 213-8502

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Haruyama, Kenji Kanagawa, JP 5 88
Iwano, Syun Kanagawa, JP 8 48
Sugiyama, Shinji Kanagawa, JP 85 741
Taira, Ritsushi Kanagawa, JP 7 106
Tanaka, Fumiaki Kanagawa, JP 13 67

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00