Hydrogen generator and fuel cell system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9966620
SERIAL NO

14924698

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydrogen generator has: a reformer that produces hydrogen-containing gas from raw material gas through reforming; a temperature detector that detects the temperature of the reformer; a hydro-desulfurizer that removes sulfur from the raw material gas through hydrodesulfurization; a recycle flow passage through which recycle gas as a portion of the hydrogen-containing gas is supplied to the hydro-desulfurizer; a raw material gas flow detector that detects the flow rate of the raw material gas, the raw material gas flow detector located somewhere in a flow passage for the raw material gas upstream of a junction of the recycle gas and the raw material gas; and a controller that controls the flow rate of the recycle gas in accordance with the temperature of the reformer, the flow rate of the raw material gas, and the flow rate of the recycle gas.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTDOSAKA-SHI OSAKA 540-6207

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abe, Miki Osaka, JP 39 603
Yukimasa, Akinori Osaka, JP 51 136

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00