Method for manufacturing excretion disposal material and excretion disposal material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9968912
SERIAL NO

14780154

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a granular excretion disposal material having a core portion and a covering layer that covers the core portion. The method includes: a granulating step of granulating the core portion by blending a core portion raw material containing pulp and highly absorbent resin, with water; a covering step of forming the covering layer by spraying a covering layer raw material containing pulp and highly absorbent resin, onto a surface of the core portion granulated in the granulating step; a drying step of drying a granular matter, in which the covering layer is formed in the covering step, with hot air; and a cooling step of cooling the granular matter dried in the drying step.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNICHARM CORPORATION182 SHIMOBUN KINSEI-CHO SHIKOKUCHUO-SHI EHIME 7990111 ?7990111

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mochizuki, Shotaro Shizuoka, JP 17 60
Otomo, Takahiro Shizuoka, JP 50 85
Sogo, Tatsuya Kagawa, JP 6 32
Takagi, Chiyo Kagawa, JP 25 96
Yamada, Hidekazu Shizuoka, JP 12 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00