Method and assembly for forming components having internal passages using a lattice structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9968991
SERIAL NO

14973501

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mold assembly for use in forming a component having an internal passage defined therein is provided. The component is formed from a component material. The mold assembly includes a mold that defines a mold cavity therein. The mold assembly also includes a lattice structure selectively positioned at least partially within the mold cavity. The lattice structure is formed from a first material that has a selectively altered composition in at least one region of the lattice structure. A channel is defined through the lattice structure, and a core is positioned in the channel such that at least a portion of the core extends within the mold cavity and defines the internal passage when the component is formed in the mold assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arnett, Michael Douglas Simpsonville, US 36 126
Intile, John Charles Simpsonville, US 16 335
Simpson, Stanley Frank Simpsonville, US 34 920

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00