Electrochemical machining apparatus for forming turbine blades

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9969021
SERIAL NO

15262016

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrochemical machining apparatus for forming turbine blades includes a main base, an upper seat and an electrode unit. The main base includes a working platform for allowing a turbine blade to be placed thereon. The working platform includes an upper step stage for resisting the turbine blade, and a lower step stage for keeping a predetermined working space from a portion of the turbine blade desired to be cut. The main base has a guiding channel for allowing an electrolyte to flow through the predetermined working space. The upper seat is configured to cover above the main base and to contact one side of the turbine blade to form an electrical connection. The electrode unit includes an anode electrode electrically connected to the upper seat and at least one cathode electrode disposed on the main base.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTAI TECHNOLOGY CORPNO 26 34TH RD TAICHUNG INDUSTRIAL DISTRICT TAICHUNG CITY R O C

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsieh, Yao-Chung Taichung, TW 6 2
Tsai, Yung-Fang Taichung, TW 15 193

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00