Method for producing agrochemical granules

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9969105
SERIAL NO

14001268

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a method for producing agrochemical granules, which contain an agrochemical active ingredient, one or more kinds of hydrophobic substances, and a substance capable of absorbing oil, with stable quality. The method for producing agrochemical granules of the present invention includes (i) a step of obtaining a mixture by mixing an agrochemical active ingredient, one or more kinds of hydrophobic substances, and a substance capable of absorbing oil together, (ii) a step of obtaining a kneaded material by loading the obtained mixture into a kneading device, kneading the mixture at a heating temperature equal to or higher than the highest melting point of the hydrophobic substances, and then causing the kneaded material to be discharged from the kneading device at a temperature equal to or lower than the highest melting point of the hydrophobic substances, and (iii) a step of granulating the obtained kneaded material by an extrusion molding method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON SODA CO LTD2-1 OHTEMACHI 2-CHOME CHIYODA-KU TOKYO 1008165 ?1008165

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shimanuki, Kazuhiro Makinohara, JP 2 2
Tanaka, Nobuyuki Takoaka, JP 228 2012

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00