Electron transport layer and film having improved thermal stability

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9972792
SERIAL NO

15083331

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Aspects of the invention provide a composition having a blend of an electron transport material and an organo alkali-metal salt wherein the salt has a glass transition greater than 115° C. The organo-alkali metal salt may be selected from the group consisting of lithium 2-(2-pyridyl)phenolate (LiPP), lithium 2-(2′,2″-bipyridine-6′-yl)phenolate (LiBPP), 2-(isoquinoline-10-yl)phenolate (LiIQP), and lithium 2-(2-phenylquinazolin-4-yl)phenolate and lithium 2-(4-phenylquinazolin-2-yl)phenolate. In a preferred embodiment, the organo-alkali metal salt is lithium 2-(2′,2″-bipyridine-6′-yl)phenolate (LiBPP). Aspects of the invention also provide films and devices having a film layer prepared from the composition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ROHM AND HAAS ELECTRONIC MATERIALS LLC; DOW GLOBAL TECHNOLOGIES LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
De, Vries Timothy S Midland, US 9 15
Kearns,, Jr Kenneth L Midland, US 6 7
McIntire, Travis E Midland, US 2 2
Mukhopadhyay, Sukrit Midland, US 64 29
Trefonas,, III Peter Medway, US 102 645
Woodward, William H H Harbor Beach, US 12 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00