Low input voltage boost converter with peak inductor current control and offset compensated zero detection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9973086
SERIAL NO

15268783

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The low input voltage boost converter with peak inductor current control and offset compensated zero detection provide a boost converter scheme to harvest energy from sources with small output voltages. Some embodiments described herein includes a thermoelectric boost converter that combines an IPEAK control scheme with offset compensation and duty cycled comparators to enable energy harvesting from TEG inputs as low as 5 mV to 10 mV, and the peak inductor current is independent to first order of the input voltage and output voltage. A control circuit can be configured to sample the input voltage (VIN) and then generate a pulse with a duration inversely proportional to VIN so as to control the boost converter switches such that a substantially constant peak inductor current is generated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSITY OF VIRGINIA PATENT FOUNDATION722 PRESTON AVE SUITE 107 CHARLOTTESVILLE VA 22903

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Calhoun, Benton Charlottesville, US 5 17
Shrivastava, Aatmesh Charlottesville, US 32 194

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00