System for power conversion with feedback to reduce DC bus loading

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9973102
SERIAL NO

15408757

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power conversion system can be implemented to reduce load disturbances on a DC bus which may be caused by load activity, such as a motor starting, stopping and/or ramping up or down. In one aspect, the power conversion system can receive externally supplied multi-phase AC electric power, such as three-phase power from a power grid, and use a converter circuit to generate the DC bus. The power conversion system can then use an inverter circuit to generate multi-phase AC electric power from the DC bus for driving the load with adjustable frequencies and/or amplitudes as desired. The power conversion system can receive feedback signals to sense the load activity and adjust the converter and/or inverter circuits accordingly to reduce the load disturbances on the DC bus.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROCKWELL AUTOMATION TECHNOLOGIES INC1 ALLEN-BRADLEY DRIVE MAYFIELD HEIGHTS OH 44124

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahmed, Ahmed Sayed Mequon, US 1 1
Seibel, Brian J Grafton, US 35 454
Vadhavkar, Prathamesh R Grafton, US 4 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00