Power supply device and method for plasma generation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9974154
SERIAL NO

15053227

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply device includes: an oscillation unit for outputting a high frequency signal; a modulation unit for outputting a pulsed high frequency signal; a level adjustment unit for adjusting and outputting a level of the pulsed high frequency signal; a power amplifier for amplifying a power outputted from the level adjustment unit; an output power detection unit for detecting an output power value from the power amplifier; and a control unit. The control unit corrects and outputs a level control signal for controlling the level of the pulsed high frequency signal based on a corresponding correction factor at each of elapsed times in an on state of the pulsed high frequency signal, and compares comparison values in a current pulse and a previous pulse to update the correction factor such that comparison result between the set power value and the output power value becomes smaller at each reflection coefficient.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HITACHI KOKUSAI ELECTRIC INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ito, Taizo Tokyo, JP 21 230
Nakamura, Manabu Tokyo, JP 88 1494

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00