Tire manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9975304
SERIAL NO

14784522

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tire manufacturing method in which a vulcanizing mold (20) is provided with a tire molding portion (21) defining an outer surface shape of a tire (1), an extrusion preparing portion (22) in which an unvulcanized rubber member (5) that forms a tread portion (2) can be disposed, and a rubber inflow path (23) communicating between the tire molding portion (21) and the extrusion preparing portion (22), wherein vulcanization molding includes: loading a casing member (4) in the tire molding portion (21) and loading the unvulcanized rubber member (5) in the extrusion preparing portion (22); extruding the unvulcanized rubber member (5) to tread molding portions (21c), (21d) through the rubber inflow path (23), the tread molding portions formed in the tire molding portion (21) and defining an outer surface shape of a land portion of the tire; and vulcanizing the unvulcanized rubber member (5) and casing member (4) together.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BRIDGESTONE CORPORATION1-1 KYOBASHI 3-CHOME CHUO-KU TOKYO 1048340 ?1048340

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Irie, Kohei Kodaira, JP 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00