Control device for hybrid vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9975541
SERIAL NO

15460840

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control device for hybrid vehicle includes an electronic control unit. The electronic control unit is configured to: calculate required electric power required for a motor for electric power generation as electric power supplied to a motor for drive based on required drive power of the hybrid vehicle; calculate an electric power suppliable time of the capacitor; and determine a rotation speed increase standby time of the internal combustion engine such that rotation speed increase standby time becomes shorter than a spare time. The spare time is a time obtained by subtracting an electric power generation delay time from the electric power suppliable time. The electric power generation delay time is a time from a time of starting the rotation speed increase until a time of starting electric power generation of the motor for electric power generation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHATOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakano, Masato Toyota, JP 60 413
Suzuki, Yoshitaka Nagakute, JP 95 759

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00