Excavating implement heading control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9976279
SERIAL NO

15233236

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An excavator comprises a chassis, an implement, and an assembly comprising a boom, a stick, and a coupling. The assembly is configured to define a heading {circumflex over (N)} and to swing with, or relative to, the chassis about a swing axis S. The stick is configured to curl relative to the boom about a curl axis C. The implement is coupled to a stick terminal point G via the coupling and is configured to rotate about a rotary axis R such that a leading edge of the implement defines a heading Î. An excavator control architecture comprises sensors and machine readable instructions to generate signals representative of {circumflex over (N)}, an assembly swing rate ωS about S, and a stick curl rate ωC about C, generate a signal representing a terminal point heading Ĝ based on {circumflex over (N)}, ωS, and ωC, and rotate the implement about R such that Î approximates Ĝ.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CATERPILLAR TRIMBLE CONTROL TECHNOLOGIES LLC5475 KELLENBURGER ROAD DAYTON OH 45424

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Padilla, Christopher A Chillicothe, US 5 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00