Method for manufacturing concrete structure, concrete curing sheet for curing concrete

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9976314
SERIAL NO

14767206

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a concrete structure comprises an installation step of installing a formwork 30 for concrete placement, a placement step of performing concrete placement in a state where a curing sheet 10 is attached to an inner surface of the formwork 30, and a demolding step of removing the formwork 30 after placement of concrete C. A contact angle of a contact surface of the curing sheet 10 for use in the placement step with water is 50 degrees or more, wherein the contact surface faces the concrete. Thus, generation of bleeding water is suppressed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KAJIMA CORPORATIONTOKYO 107-8388

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goda, Taizo Tokyo, JP 1 1
Hirata, Shusaku Tokyo, JP 1 1
Iwata, Mitsunori Tokyo, JP 3 6
Kondo, Keiji Tokyo, JP 30 181
Nishioka, Kazunori Tokyo, JP 1 1
Nukushina, Tatsuya Tokyo, JP 1 1
Sakai, Goro Tokyo, JP 1 1
Sakata, Noboru Tokyo, JP 5 72
Watanabe, Kenzo Tokyo, JP 18 230
Yanai, Shuji Tokyo, JP 3 6
Yokozeki, Kosuke Tokyo, JP 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00