Burning apparatus and method for manufacturing reduced iron using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9976806
SERIAL NO

14526607

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing reduced iron using the same, and more particularly, to a burning apparatus heating a coal briquette to manufacture reduced iron, which includes a first burning furnace heating the coal briquette while moving the truck accommodating the coal briquette along a linear movement path; a second burning furnace connected to the other side of the first burning furnace, and heating the coal briquette while moving the coal briquette discharged from the truck along an annular path; and a cooling device connected to the second burning furnace, and cooling the reduced iron while moving reduced iron reduced in the second burning furnace along an annular path. The burning apparatus circulates exhaust gases generated in the burning furnace and cooling device to control a temperature and an oxygen concentration and thus improves a metallization rate of the reduced iron.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • POSCO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hwang, Byung Woon Pohang-Si, KR 1 0
Park, Jong In Pohang-Si, KR 22 60
Son, Sang Han Pohang-Si, KR 1 0
Wang, Min Kyu Pohang-Si, KR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00