Position control apparatus, position control method, optical apparatus, and imaging apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9977419
SERIAL NO

14671543

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A target generating unit outputs a target value signal of a control target, and a position encoding processing unit outputs a position detection signal of the control target. A PID compensator calculates a control amount for causing the control target to follow a target position based on a difference signal between the target value signal and the position detection signal, and outputs it to an adding unit. A disturbance estimation observer outputs the result of estimation of disturbance to the adding unit. The adding unit adds the control amount output of the PID compensator to the output of the disturbance estimation observer to calculate a total control amount. A storage unit stores a control amount during position control to a fixing position as an attitude difference correction amount, and the disturbance estimation observer performs disturbance estimation using a control amount obtained by subtracting a value stored in the storage unit during position control to a moving position from the total control amount.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANON KABUSHIKI KAISHATOKYO 146-8501

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tanaka, Shuya Kawasaki, JP 18 115

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00