Multilayer ceramic electronic component and board for mounting the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9978514
SERIAL NO

14080517

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a multilayer ceramic electronic component including, a ceramic body including a plurality of dielectric layers stacked in a thickness direction, satisfying T/W>1.0 when a width and a thickness thereof are defined as W and T, respectively, and having a groove portion inwardly recessed in a length direction in at least one main surface thereof, a plurality of first and second internal electrodes disposed in the ceramic body to face each other, having the dielectric layers interposed therebetween, and alternately exposed through both end surfaces of the ceramic body, and first and second external electrodes formed to extend from the both end surfaces of the ceramic body to the at least one main surface having the groove portion formed therein.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRO-MECHANICS CO LTDMAEYOUNG-RO 150 (MAETAN-DONG) YOUNGTONG-GU GYEONGGI-DO SUWON-SI 16674

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Jae Yeol Gyunggi-Do, KR 127 1062
Han, Byung Woo Gyunggi-do, KR 7 21
Kim, Sang Huk Gyunggi-do, KR 34 288
Oh, Dae Bok Gyunggi-do, KR 35 206

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00