System and method for controlling a power distribution network

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9979192
SERIAL NO

14445789

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical power system includes an electrical power distribution network and a control device configured to regulate at least one attribute of said electrical power system. The electrical power system further includes a processor coupled to the control device configured to identify an out-of-bound condition on said electrical power distribution network at a first time. The out-of-bound condition is associated with the at least one attribute. The processor is also configured to determine a trend for the at least one attribute at a second time that is later than the first time after a predetermined delay time elapses. The trend indicates a direction away from at least one of a predetermined range and a predetermined value. The processor is also configured to transmit a control action to said control device based at least in part on the trend.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE DIGITAL HOLDINGS LLC2700 CAMINO RAMON SAN RAMON CA 94583-9130

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Acharya, Naresh Niskayuna, US 12 70
Bebic, Jovan Z Clifton Park, US 8 14
Johal, Harjeet Herndon, US 8 304
Shao, Miaolei Altamont, US 5 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00