Cyclone reservoir

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9981208
SERIAL NO

14487655

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cyclone reservoir for separation of an aerated portion of a hydraulic fluid and a related method of making the cyclone reservoir. The cyclone reservoir includes a lower chamber having a generally cylindrical side wall, a return port, and a suction port. An upper chamber is connected to the lower chamber by a neck section that places the interior volumes of the lower and upper chambers in fluid communication with one another. The neck section has a cross-sectional area taken perpendicular to a central axis of the reservoir that is smaller than a cross-sectional area of the lower chamber and the upper chamber at a different position along the central axis. The chambers and neck section may be made as a single-piece part by molding the reservoir by, for example, rotomolding. A reinforcement band may also go around the neck section to connect and support the upper and lower chambers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UBS AG STAMFORD BRANCH AS SUCCESSOR AGENT600 WASHINGTON BOULEVARD STAMFORD CT 06901

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Doll, Robert A Nashotah, US 10 88

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00