Reactor usable for decontamination of fluids and method of use

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9981862
SERIAL NO

14354292

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for the decontamination of contaminated liquid, as well as a reactor for implementing a decontamination method. The method comprises a step of mixing the contaminated liquid under stirring with at least one persulphate ion with the exception of ammonium persulphate, and at least iron, an iron atom or an iron ion in its ferrous or ferric form at a concentration between 50 μM and 600 μM, preferably between 100 μM and 400 μM, a second step in which the mixture obtained is subjected for a sufficient time to at least one UV/visible irradiation having a narrow wavelength spectrum comprised between 153 nm and 560 nm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE (CNRS)3 RUE MICHEL ANGE PARIS 75016
UNIVERSITE D'AIX MARSEILLE58 BOULEVARD CHARLES LIVON MARSEILLE CEDEX 07 13284

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barbati, Stephane Marseilles, FR 2 2
Bouzidi, Hichem Douai, FR 1 2
Chiron, Serge Marseilles, FR 1 2
Mahdi, Ahmed Moussa Djibouti, DJ 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00