Precursor composite material, method for producing a precursor composite material, method for producing a composite material and use of a precursor composite material and of a composite material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9982167
SERIAL NO

15101868

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A precursor composite material (60) is provided, having a layer sequence (50) comprising an adhesive layer (20), a carrier layer (10) on the adhesive layer (20), a release layer (40) on the carrier layer (10) and a parting layer (30) on the release layer (40), wherein the layer sequence (50) is arranged in such a way that the side of the adhesive layer (20) facing away from the layer sequence (50) is arranged at least in sub-regions on the side of the parting layer (30) facing away from the layer sequence (50). Further provided are a composite material, a method for producing the precursor composite material, a method for producing the composite material and a use of the precursor composite material and of the composite material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INFIANA GERMANY GMBH & CO KG91301 FORCHHEIM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hermann, Christian Eggolsheim, DE 6 6
Schuhmann, Michael Grosshabersdorf, DE 15 41

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00