Control method of boosting apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9982610
SERIAL NO

15155454

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control method of a boosting apparatus includes: driving the boosting apparatus according to driving maps pre-input to a controller, judging driving conditions of an engine, selecting a driving map pre-input to the controller and reflecting the driving conditions in the selected driving map, correcting the driving maps of the boosting apparatus based on the selected driving map and driving the boosting apparatus based on the corrected driving maps, and confirming whether variations in operating amounts of the boosting apparatus are generated and, when the variations are confirmed, correcting the operating amounts of the boosting apparatus and reflecting the corrected operating amounts in the driving maps. In particular, the controller controls an EGR valve according to driving conditions through operation of the boosting apparatus and thus controls the amount of EGR gas supplied to the engine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYUNDAI MOTOR COMPANYSEOUL 06797

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Hyo Sang Suwon-si, KR 11 37
Kim, Young Ho Hwaseong-si, KR 253 3236
Lee, Jung Sub Yongin-si, KR 13 50
Yu, Seung Eun Seoul, KR 14 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00