Composite ballistic resistant laminate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9982967
SERIAL NO

14709627

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An impact penetration resistant laminate comprises a plurality of alternating layers of (i) non-fibrous ultra-high molecular weight polyethylene monolayers and (ii) a thermoplastic adhesive, the adhesive having a basis weight of no greater than 5 gsm and a zero-shear-rate viscosity, determined from an oscillating disc rheometer in a frequency sweep between 0.1 rad/s and 100 rad/s, conducted per ASTM D 4440 at 125° C., and calculated from fitting to a Carrea-Yasuda four parameter model, of at least 1500 Pa-s, wherein

    (a) at least 90 percent of the monolayers are arranged such that the orientation of one monolayer is offset with respect to the orientation of an adjacent monolayer, and(b) the modulus of elasticity through the thickness of the laminate is at least 3 GPa.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • E I DU PONT DE NEMOURS AND COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Carbajal, Leopoldo Alejandro Newark, US 19 83
Kampert, William George Wilmington, US 6 18
Libert, Timothy A Hockessin, US 13 27
Sauer, Bryan Benedict Wilmington, US 29 120
Singletary, James Neal Midlothian, US 9 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00