Hydrogen-propelled bullet and a method of making thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9982983
SERIAL NO

15424521

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydrogen-propelled projectile for using with a firearm eliminates cleaning the firearm and a method of making the projectile eliminates storing explosive propellant. The projectile has a cylindrical brass body closed at top and sealed at bottom with a primer and a brass seal. When the projectile is used with the firearm, the primer ignites hydrogen in the presence of oxygen, producing water vapor and energy that propels projectile toward a target. To make the projectile a salt water solution is electrolyzed to produce hydrogen and oxygen. A mixture of hydrogen and oxygen is then fed to a loader. The loader fills up the projectile, attached at a gas outlet, with gas by exerting pressure on gas using a load piston and channeling gas to the projectile. Finally, the loader seals the projectile with the primer by pressing a primer ram and affixing the primer at bottom of the projectile.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Householder, Melvin E Shavano Park, US 2 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00