Coil mounting structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9984806
SERIAL NO

14645244

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a coil mounting structure for a device that comprises a primary coil to be supplied with an alternating current, and a secondary coil arranged facing the primary coil and configured to supply an electric power to a load provided in a housing by using an induced voltage generated by an electromagnetic field produced by the primary coil. The coil mounting structure comprises at least one mounting part provided in a region of the housing, the region facing the primary coil, and the at least one mounting part is configured to hold the secondary coil to the housing. The at least one mounting part comprises at least one gap area configured to interrupt a circuit generated by the at least one mounting part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CENTRAL JAPAN RAILWAY COMPANY1-4 MEIEKI 1-CHOME MINATO-KU TOKYO 450-6101

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hagiwara, Yoshiyasu Yamato, JP 5 34
Murai, Toshiaki Hachioji, JP 38 531
Shimode, Daisuke Narashino, JP 3 19
Takahashi, Yukio Toyohashi, JP 170 1461
Tobikawa, Masayuki Yokohama, JP 3 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00